Saturday 13 September 2014

Kitchen Countertops are Installed!

When the countertops were ordered they told us it would be around two weeks until they would be ready.  The issue when they came in was how we would get them safely out to Indian Head since one piece was around 14feet long.  We couldn't just put it in our truck because if we hit a good size bump the piece could bounce and break.  The day my dad picked up the sand for the stucco, we also picked up the countertops.  It worked out perfectly as the sand almost worked as a cushion and my dad's trailer is much longer than our truck.

Now that they were actually in the church, we needed to install them.  William asked his brother David to help.  This is the long piece and the side by the stove.



This is by the pass-through.



Here it is installed.  As you can see there is no hole for the sink.  The guys had to cut the counter for the sink.  A little issue was that William's father had given us an extra sink he had but it did not have a template for cutting the countertop.  This made things a little more difficult but the guys got it done no problem.




And putting in the sink.


A few days later William's father came over and help attach the plumbing for the sink.  The last thing we need to connect is the dishwasher.  For now I am just happy to have my double sink.  Here is everything all done.





It's so nice to have the kitchen all put together.  Now to decide where everything is going to go.  With so much space I am having a hard time deciding.  A nice problem to have!  Thanks David for all the help!

No comments:

Post a Comment